[Construction Example] Heat Pump Melt Snow Facility (Cool Sewage)
Can be used for cooling even in summer! Achieves low running costs by not using a heat pump.
We would like to introduce a case of the "Heat Pump-less Snow Melting Facility (Cool Sewage)" constructed on the park sidewalk in Tsurumi Ward, Yokohama City. The feature of this facility is that it is a system that circulates sewage heat without using a heat pump, achieving low running costs. Additionally, by operating it during the summer, it can also be used for cooling pavements and bench handrails, which is why it is referred to as "Cool Sewage." 【Facility Overview】 ■ Construction Year: 2018 ■ Construction Location: "Tsurugamine Machikado Plaza," Tsurumi Ward, Yokohama City ■ Sewage Pipe Diameter: Circular 1500mm ■ Design Snow Melting Heat: 201.2W/m2, Design Hourly Snowfall Depth: 1.95cm/h, Total Design Heat: 4.95kW *For more details, please refer to the PDF document or feel free to contact us.
- 企業:興和 本社
- 価格:Other